DEVELOPMENT PHOTOS

View from slides


Play area & Slides


Pirate statue at Splash! entrance


Buccaneer Bay Entrance with canopies


25-yard pool with canopies


Aerial photo taken by Greg Peters


Aerial photo taken by Greg Peters


Lazy river


Slides & Lazy river


25-yard pool


Play area


25-yard pool


Spa


Back of facility


Cannon & Slides


Cannon & Slides


Buccaneer Bay Entrance


Skull Rock & Marooned Ship


Slides


Treasure Chest


Entrance


Marooned Ship


Slides


Cannon Wall


Entrance to Buccaneer Bay


Bleachers


Scoreboard located at the 50-meter pool.


Bleachers located at the 50-meter pool.


Entrance to Buccanneer Bay.


Parrot at play structure.


Marooned ship


Play structure


Play structure













March 2007


March 2007


Forms for the decorative concrete are being set.


Shade structures are in place around the 25-yard pool.



Walls to the Aquatics Center building are being formed.


The supporting foundation for the three slides has been set.



Tile is being placed around the edges of the 50-meter pool.
January 10, 2007


 



Tile is being placed around the edges of the 25-yard pool.
January 10, 2007


 



Contractors are smoothing out the cement for the lazy river.
January 10, 2007


 


Contractors are placing down the cement for the lazy river.
January 10, 2007


 

Contractors are installing the pipes for the flowing river channel.
January 3, 2007


 

These pipes lead to the 50-meter pool.
January 3, 2007


 



Contractors are setting the forms for the Aquatics Center building.
December 26, 2006


 



The rebar is being installed for the flowing river channel.
December 26, 2006



Lights have been installed by the 50-meter pool.
November 29, 2006


 


Concrete was poured in the 50-meter pool.
November 14, 2006



Panoramic view of the aquatics construction on November 2, 2006.


This photo shows the entrance to the 25-yard pool.
October 27, 2006


Contractors are pouring concrete for the 25-yard pool.
October 19, 2006


 

Contractors are building the block wall surrounding the perimeter of the Sheriff's Station expansion.
December 6, 2006


Aquatics construction began on August 3, 2006.